LONG NOSE POINT OUTFALL
|
|||||||||
|
Click the photograph for a enlarged view |
Future Developments The present design capacity was to be adequate until 1997, when a second stage was planned to raise the design capacity to 16,000 EP. The current status of this augmentation is uncertain.
|
||||||||||
|
Long Nose Pt. |
(Long_1) Last updated June 2000 |
||||||||||