LONG NOSE POINT OUTFALL

Click the photograph for a enlarged view

Future Developments


The present design capacity was to be adequate until 1997, when a second stage was planned to raise the design capacity to 16,000 EP. The current status of this augmentation is uncertain.

Long Nose Pt. 

 

(Long_1) Last updated June 2000